New clients: 24% off your first 3 projects · delivery within 24 hours info@quantoestimates.com · Serving AU · USA · UK · CA · NZ · EU
Get a Free Quote
Home / Trades / Structural Steel
DIV 05 · Structural Steel

Structural Steel Estimating Services and Takeoffs

Quanto Estimates provides structural steel estimating services for builders and trade contractors, with accurate takeoffs and priced estimates prepared from your drawings in 24–48 hours.

How we measure structural steel

We measure structural steel members by section and length, convert them to tonnage, and list base plates, connections, bolts and surface treatment. Purlins, girts and miscellaneous metalwork are taken off as separate items.

What we take off

  • Columns, beams and bracing by section
  • Tonnage summary
  • Base plates and connections
  • Bolts and fixings
  • Purlins and girts
  • Paint or galvanising

Takeoff only or fully priced

Choose measured quantities only if you prefer to apply your own rates, or a fully priced estimate with current local material and labour rates. Both come as an editable Excel workbook with marked-up drawings, ready for your tender.

Need the whole job priced? Combine this trade with a full bid estimate or a bill of quantities for the entire project.

Our deliverable

Structural Steel estimate, Excel format

An extract from a structural steel estimate priced in AUD with GST. US, UK, Canadian, NZ and European projects are priced in local currency and units.

Structural_Steel_Estimate_Rev01.xlsxAUD
SummaryTakeoffNotes
G6=SUM(G2:G5)
ItemDescriptionUnitQtyRateAmount
1Structural Steel — Takeoff Extract
25.1Universal beams 310UBt6.844,850.0033,174.00
35.2Universal columns 200UCt4.264,850.0020,661.00
45.3C-purlins C200m642.0028.5018,297.00
55.4Base plates and connectionsitem16,400.006,400.00
6Subtotal (excl. GST)78,532.00
7GST 10%7,853.20
8Total incl. GST (AUD)86,385.20
FAQ

Frequently asked questions

Still have a question? Email info@quantoestimates.com and we'll reply the same day.

Do you include connections?

Yes. Base plates, cleats and connections are listed, either itemised or as an allowance when details are not drawn.

Can you give steel by tonnage?

Yes. Members are listed by section and length with a tonnage summary.

24% off your first 3 projects

Try Quanto on your next tenders. New clients get 24% off their first three estimates, with delivery within 24 hours.

Claim the Offer
Get a quote

Send your plans. Get a fixed price today.

Tell us about the project and your bid date. We'll reply with a fixed price and delivery time, usually within a few hours.

General enquiriesinfo@quantoestimates.com
Send plans for a quotequote@quantoestimates.com
Response timeSame business day

Request a free quote

We reply with a fixed price, usually the same business day.