Structural Steel Estimating Services and Takeoffs
Quanto Estimates provides structural steel estimating services for builders and trade contractors, with accurate takeoffs and priced estimates prepared from your drawings in 24–48 hours.
How we measure structural steel
We measure structural steel members by section and length, convert them to tonnage, and list base plates, connections, bolts and surface treatment. Purlins, girts and miscellaneous metalwork are taken off as separate items.
What we take off
- Columns, beams and bracing by section
- Tonnage summary
- Base plates and connections
- Bolts and fixings
- Purlins and girts
- Paint or galvanising
Takeoff only or fully priced
Choose measured quantities only if you prefer to apply your own rates, or a fully priced estimate with current local material and labour rates. Both come as an editable Excel workbook with marked-up drawings, ready for your tender.
Need the whole job priced? Combine this trade with a full bid estimate or a bill of quantities for the entire project.
Structural Steel estimate, Excel format
An extract from a structural steel estimate priced in AUD with GST. US, UK, Canadian, NZ and European projects are priced in local currency and units.
=SUM(G2:G5)| Item | Description | Unit | Qty | Rate | Amount | |
|---|---|---|---|---|---|---|
| 1 | Structural Steel — Takeoff Extract | |||||
| 2 | 5.1 | Universal beams 310UB | t | 6.84 | 4,850.00 | 33,174.00 |
| 3 | 5.2 | Universal columns 200UC | t | 4.26 | 4,850.00 | 20,661.00 |
| 4 | 5.3 | C-purlins C200 | m | 642.00 | 28.50 | 18,297.00 |
| 5 | 5.4 | Base plates and connections | item | 1 | 6,400.00 | 6,400.00 |
| 6 | Subtotal (excl. GST) | 78,532.00 | ||||
| 7 | GST 10% | 7,853.20 | ||||
| 8 | Total incl. GST (AUD) | 86,385.20 | ||||
Frequently asked questions
Still have a question? Email info@quantoestimates.com and we'll reply the same day.
Do you include connections?
Yes. Base plates, cleats and connections are listed, either itemised or as an allowance when details are not drawn.
Can you give steel by tonnage?
Yes. Members are listed by section and length with a tonnage summary.
24% off your first 3 projects
Try Quanto on your next tenders. New clients get 24% off their first three estimates, with delivery within 24 hours.
Send your plans. Get a fixed price today.
Tell us about the project and your bid date. We'll reply with a fixed price and delivery time, usually within a few hours.