Masonry Estimating Services and Takeoffs
Quanto Estimates provides masonry estimating services for builders and trade contractors, with accurate takeoffs and priced estimates prepared from your drawings in 24–48 hours.
How we measure masonry
We measure brickwork, blockwork and stonework by face area and convert it to unit counts, mortar and accessories. Openings are deducted and lintels, ties, DPC and control joints are listed so nothing is missed.
What we take off
- Brick veneer and double brick
- Core-filled and hollow blockwork
- Stone cladding
- Lintels, ties and DPC
- Control joints and weep holes
- Unit counts with waste
Takeoff only or fully priced
Choose measured quantities only if you prefer to apply your own rates, or a fully priced estimate with current local material and labour rates. Both come as an editable Excel workbook with marked-up drawings, ready for your tender.
Need the whole job priced? Combine this trade with a full bid estimate or a bill of quantities for the entire project.
Masonry estimate, Excel format
An extract from a masonry estimate priced in AUD with GST. US, UK, Canadian, NZ and European projects are priced in local currency and units.
=SUM(G2:G5)| Item | Description | Unit | Qty | Rate | Amount | |
|---|---|---|---|---|---|---|
| 1 | Masonry — Takeoff Extract | |||||
| 2 | 4.1 | Face brick veneer | m² | 386.40 | 128.00 | 49,459.20 |
| 3 | 4.2 | 200 series blockwork, core filled | m² | 142.80 | 165.00 | 23,562.00 |
| 4 | 4.3 | Steel lintels | m | 48.60 | 62.00 | 3,013.20 |
| 5 | 4.4 | Brick ties and DPC | item | 1 | 1,850.00 | 1,850.00 |
| 6 | Subtotal (excl. GST) | 77,884.40 | ||||
| 7 | GST 10% | 7,788.44 | ||||
| 8 | Total incl. GST (AUD) | 85,672.84 | ||||
Frequently asked questions
Still have a question? Email info@quantoestimates.com and we'll reply the same day.
Do you convert areas into brick counts?
Yes. We give face areas and the number of bricks or blocks with a waste allowance.
Are openings deducted?
Yes. Door and window openings are deducted and lintels are listed separately.
24% off your first 3 projects
Try Quanto on your next tenders. New clients get 24% off their first three estimates, with delivery within 24 hours.
Send your plans. Get a fixed price today.
Tell us about the project and your bid date. We'll reply with a fixed price and delivery time, usually within a few hours.