Carpentry & Framing Estimating Services and Takeoffs
Quanto Estimates provides carpentry & framing estimating services for builders and trade contractors, with accurate takeoffs and priced estimates prepared from your drawings in 24–48 hours.
How we measure carpentry & framing
We measure wall framing, floor framing, roof framing and trusses from architectural and engineering drawings, with lintels, bracing and tie-downs listed. Lumber lists come in stock lengths so your framer and supplier can work from the same numbers.
What we take off
- Wall frames and plates
- Floor joists and bearers
- Roof trusses and rafters
- Lintels and beams
- Bracing and tie-downs
- Lumber list in stock lengths
Takeoff only or fully priced
Choose measured quantities only if you prefer to apply your own rates, or a fully priced estimate with current local material and labour rates. Both come as an editable Excel workbook with marked-up drawings, ready for your tender.
Need the whole job priced? Combine this trade with a full bid estimate or a bill of quantities for the entire project.
Carpentry & Framing estimate, Excel format
An extract from a carpentry & framing estimate priced in AUD with GST. US, UK, Canadian, NZ and European projects are priced in local currency and units.
=SUM(G2:G5)| Item | Description | Unit | Qty | Rate | Amount | |
|---|---|---|---|---|---|---|
| 1 | Carpentry & Framing — Takeoff Extract | |||||
| 2 | 6.1 | Wall framing 90×45 MGP10 | m | 684.00 | 18.50 | 12,654.00 |
| 3 | 6.2 | Roof trusses, supply and install | m² | 246.00 | 46.00 | 11,316.00 |
| 4 | 6.3 | LVL lintels | m | 38.40 | 64.00 | 2,457.60 |
| 5 | 6.4 | Bracing and tie-downs | item | 1 | 2,450.00 | 2,450.00 |
| 6 | Subtotal (excl. GST) | 28,877.60 | ||||
| 7 | GST 10% | 2,887.76 | ||||
| 8 | Total incl. GST (AUD) | 31,765.36 | ||||
Frequently asked questions
Still have a question? Email info@quantoestimates.com and we'll reply the same day.
Do you produce lumber lists?
Yes. We give a lumber list in stock lengths with waste, ready to send to your supplier.
Can you price framing labour?
Yes. We can price supply only, labour only or supply and install.
24% off your first 3 projects
Try Quanto on your next tenders. New clients get 24% off their first three estimates, with delivery within 24 hours.
Send your plans. Get a fixed price today.
Tell us about the project and your bid date. We'll reply with a fixed price and delivery time, usually within a few hours.