New clients: 24% off your first 3 projects · delivery within 24 hours info@quantoestimates.com · Serving AU · USA · UK · CA · NZ · EU
Get a Free Quote
Home / Trades / Civil & Drainage
DIV 33 · Civil & Drainage

Civil & Drainage Estimating Services and Takeoffs

Quanto Estimates provides civil & drainage estimating services for builders and trade contractors, with accurate takeoffs and priced estimates prepared from your drawings in 24–48 hours.

How we measure civil & drainage

We measure stormwater, sewer and subsoil drainage by pipe size and length, count pits and manholes by depth, and measure kerbs, roads and pavements. Trenching and backfill are included with each run.

What we take off

  • Stormwater pipes and pits
  • Sewer mains and junctions
  • Subsoil drainage
  • Kerbs and channels
  • Road pavements
  • Trenching and backfill

Takeoff only or fully priced

Choose measured quantities only if you prefer to apply your own rates, or a fully priced estimate with current local material and labour rates. Both come as an editable Excel workbook with marked-up drawings, ready for your tender.

Need the whole job priced? Combine this trade with a full bid estimate or a bill of quantities for the entire project.

Our deliverable

Civil & Drainage estimate, Excel format

An extract from a civil & drainage estimate priced in AUD with GST. US, UK, Canadian, NZ and European projects are priced in local currency and units.

Civil_Drainage_Estimate_Rev01.xlsxAUD
SummaryTakeoffNotes
G6=SUM(G2:G5)
ItemDescriptionUnitQtyRateAmount
1Civil & Drainage — Takeoff Extract
218.1Stormwater pipe 375mm RCPm146.00285.0041,610.00
318.2Stormwater pits 900×900no82,450.0019,600.00
418.3Sewer main 150mm PVCm112.00195.0021,840.00
518.4Kerb and channelm224.0085.0019,040.00
6Subtotal (excl. GST)102,090.00
7GST 10%10,209.00
8Total incl. GST (AUD)112,299.00
FAQ

Frequently asked questions

Still have a question? Email info@quantoestimates.com and we'll reply the same day.

Do you include trenching?

Yes. Trenching, bedding and backfill are measured with each pipe run.

Are pits measured by depth?

Yes. Pits and manholes are listed by size and depth range.

24% off your first 3 projects

Try Quanto on your next tenders. New clients get 24% off their first three estimates, with delivery within 24 hours.

Claim the Offer
Get a quote

Send your plans. Get a fixed price today.

Tell us about the project and your bid date. We'll reply with a fixed price and delivery time, usually within a few hours.

General enquiriesinfo@quantoestimates.com
Send plans for a quotequote@quantoestimates.com
Response timeSame business day

Request a free quote

We reply with a fixed price, usually the same business day.