Demolition Estimating Services and Takeoffs
Quanto Estimates provides demolition estimating services for builders and trade contractors, with accurate takeoffs and priced estimates prepared from your drawings in 24–48 hours.
How we measure demolition
We measure demolition and strip-out by area, volume or item from existing condition drawings and site photos, and list waste removal and disposal separately. Asbestos and hazardous materials are flagged as provisional items.
What we take off
- Full building demolition
- Internal strip-out
- Slab and footing removal
- Waste removal and disposal
- Hazardous material allowances
- Make-safe and protection
Takeoff only or fully priced
Choose measured quantities only if you prefer to apply your own rates, or a fully priced estimate with current local material and labour rates. Both come as an editable Excel workbook with marked-up drawings, ready for your tender.
Need the whole job priced? Combine this trade with a full bid estimate or a bill of quantities for the entire project.
Demolition estimate, Excel format
An extract from a demolition estimate priced in AUD with GST. US, UK, Canadian, NZ and European projects are priced in local currency and units.
=SUM(G2:G5)| Item | Description | Unit | Qty | Rate | Amount | |
|---|---|---|---|---|---|---|
| 1 | Demolition — Takeoff Extract | |||||
| 2 | 19.1 | Internal strip-out | m² | 486.00 | 45.00 | 21,870.00 |
| 3 | 19.2 | Slab removal 150mm | m² | 212.00 | 38.00 | 8,056.00 |
| 4 | 19.3 | Waste removal and disposal | t | 64.00 | 165.00 | 10,560.00 |
| 5 | 19.4 | Asbestos removal (provisional) | item | 1 | 8,500.00 | 8,500.00 |
| 6 | Subtotal (excl. GST) | 48,986.00 | ||||
| 7 | GST 10% | 4,898.60 | ||||
| 8 | Total incl. GST (AUD) | 53,884.60 | ||||
Frequently asked questions
Still have a question? Email info@quantoestimates.com and we'll reply the same day.
Can you estimate from site photos?
Yes. Existing drawings and site photos help us measure strip-out, and we note any assumptions.
Do you include asbestos removal?
Hazardous materials are listed as provisional items until a survey confirms the scope.
24% off your first 3 projects
Try Quanto on your next tenders. New clients get 24% off their first three estimates, with delivery within 24 hours.
Send your plans. Get a fixed price today.
Tell us about the project and your bid date. We'll reply with a fixed price and delivery time, usually within a few hours.